Description:
1. Product category: Master Link Assembly.
2. Reference standard: DIN5688 & part of the 3-86, QIJL022-2007.
3. Adopt high-quality structural alloy steel as raw material.
4. The master link assembly (European Type) is manufactured by forging and welding.
5. Special heat treatment.
6. Non-destructive test is performed.
7. Specifications: With full range of product specification, working capacity: 0.5t-120t, can meet different hoisting requirements with various types.
8. Usage: Used as connection between the slings or between the sling and the suspended in the lifting, bunding, draging and fastening operation.
Main Features:
Manufacture with prescision drop forging, heat treatment and surface treatment process.
With full range of product specification, working capacity:0.5t - 120t, we can meet different hoisting requirements with various types.
Product Usage:
Product use: Used as connection between the slings or between the sling and the suspended in the lifting, bunding, draging and fastening opearation.
Specifications
G80 Master Link Assembly (European Type) | ||||||||||
Art. No. | Working load limit (t) | Dimensions (mm) | Self Weight (kg) | |||||||
D | P | L | D1 | P1 | L1 | SxX | ||||
ACH6 | 2.36 | 19 | 135 | 75 | 13 | 60 | 38 | 8X25 | 1.315 | |
ACH7 | 3.15 | 19 | 135 | 75 | 13 | 60 | 38 | 8X25 | 1.315 | |
ACH8 | 4.25 | 23 | 160 | 90 | 16 | 70 | 34 | 8X25 | 2.32 | |
ACH10 | 6.7 | 27 | 180 | 100 | 18 | 85 | 40 | 11.5X35 | 3.52 | |
ACH13 | 11.2 | 33 | 200 | 110 | 23 | 115 | 50 | 14X35 | 6.26 | |
ACH16 | 17 | 36 | 260 | 140 | 27 | 140 | 65 | 18X46 | 9.56 | |
ACH18 | 21.2 | 45 | 340 | 180 | 33 | 150 | 70 | —— | 18.92 | |
ACH20 | 26.5 | 50 | 350 | 190 | 33 | 150 | 70 | —— | 22.65 | |
ACH22 | 31.5 | 50 | 350 | 190 | 36 | 170 | 75 | —— | 25.19 | |
ACH26 | 45 | 60 | 400 | 200 | 40 | 170 | 80 | —— | 36.01 | |
ACH32 | 67 | 70 | 460 | 250 | 50 | 200 | 100 | —— | 64.4 |
G63 Master Link Assembly (Master Link Forged) | ||||||||||
Art. No. | Working load limit (t) | Master Link WLL(t) | Middle Link WLL(t) | Master Link Size (mm) | Middle Link Size(mm) | Self Weight (kg) | ||||
D | P | L | D1 | P1 | ||||||
ZDH0.5 | 0.5 | 0.5 | 0.36 | 12 | 50 | 100 | 8 | 20 | 0.36 | |
ZDH1 | 1 | 1 | 0.75 | 14 | 65 | 130 | 10 | 25 | 0.66 | |
ZDH2 | 2 | 2 | 1.4 | 16 | 65 | 130 | 12 | 25 | 0.91 | |
ZDH3 | 3 | 3 | 2.2 | 20 | 80 | 150 | 14 | 30 | 1.6 | |
ZDH5 | 5 | 5 | 3.5 | 24 | 90 | 160 | 18 | 40 | 2.77 | |
ZDH8 | 8 | 8 | 6.4 | 28 | 100 | 190 | 22 | 40 | 4.45 | |
ZDH10 | 10 | 10 | 7 | 32 | 110 | 200 | 26 | 50 | 6.75 | |
ZDH12 | 12 | 12 | 8.4 | 34 | 120 | 230 | 28 | 50 | 8.31 | |
ZDH16 | 16 | 16 | 11.2 | 38 | 135 | 250 | 30 | 60 | 11.38 | |
ZDH20 | 20 | 20 | 14 | 42 | 140 | 270 | 35 | 70 | 16.04 | |
ZDH25 | 25 | 25 | 17.5 | 46 | 160 | 310 | 38 | 70 | 20.85 | |
ZDH30 | 30 | 30 | 21 | 52 | 180 | 330 | 42 | 80 | 28.94 | |
ZDH40 | 40 | 40 | 28 | 56 | 180 | 330 | 45 | 80 | 33.92 | |
ZDH50 | 50 | 50 | 35 | 62 | 210 | 410 | 50 | 100 | 50.41 | |
ZDH63 | 63 | 63 | 44 | 68 | 210 | 410 | 55 | 100 | 61.87 | |
ZDH80 | 80 | 80 | 56 | 76 | 240 | 410 | 65 | 130 | 92.82 | |
ZDH100 | 100 | 100 | 70 | 84 | 240 | 460 | 70 | 130 | 117.1 | |
ZDH120 | 120 | 120 | 85 | 90 | 254 | 508 | 75 | 140 | 145.5 |
Package
JULI standard export package: Packing bag and Carton, Customized packaging according to customer needs
Manufacturing Process
The hook body is manufactured with high-quality alloy steel by die forging, heat treatment. There are signs such as WORKING LOAD LIMIT and product grade on the link.
Export Cases
-Main markets: America, Canada, Mexico, the Middle East, Africa, Australia, Russia, Europe, Japan, Vietnam, India, etc
-Exhibitions:2015.10 KORMARINE, 2016.11 OSEA, 2018.11 OSEA, 2019.11 ADIPEC, 2020.11 Bauma China, 2023.4 Neftegaz, 2024.3 OTC ASIA, 2024.5 OTC America.
FAQ
Q1:Are you factory or business company?
Juli Sling is an OEM&ODM manufacturer with nearly 38 years of history. Focusing on research and development and manufacturing of rigging.
Q2:What is your terms of delivery?
Accept EXW, FOB, CIF, etc. If you have any other choices or requirements, we could negotiate it together to help you find the most convenient and favorable one.
Q3:How does your factory do regarding quality control?
Quality is priority. We always attach great importance to quality controlling. Skillful workers care every details during the production; Strict quality testing in each process; Authoritative testing reports can be provided for customer.
Q4:What payment method is available?
By T/T, L/C, Other methods can be negotiated together.
Catalogue
Download Document
Whether is a product enquiry or technical help, please send messager here, our team will respond within 24-48 hours.