• mooring wire ropes were certified by Bureau Veritas

    Juli Sling Supplies Certified Permanent Mooring System for Haiyang Shiyou 116 FPSO

    Haiyang Shiyou 116 is a 100,000-ton class FPSO developed by CNOOC and the core of the Wenchang Oilfield Cluster, serving as a fully integrated offshore oil and gas production facility. Juli Sling Co., Ltd. is proud to have supplied the permanent mooring system, including:– Nine upper mooring wire ropes (φ128 mm × 250 m)– Two lower mooring wire […]

    Read more
  • Juli Sling to Exhibit at Marintec China 2025

    Juli Sling to Exhibit at Marintec China 2025

    Visit us at Booth W4C3C to explore our full range of marine lifting and rigging solutions, designed to ensure safety, durability, and efficiency in demanding offshore and marine applications. Why visit Juli Sling at Marintec China: Schedule a meeting in advance:📧 aaron@julisling.com📞 +86-312-8608539 We look forward to seeing you at Marintec China 2025 and building […]

    Read more
  • Meet Juli Sling Co., Ltd. at ADIPEC 2025: Safer, Smarter Heavy Lifts for Oil & Gas

    Why Now: Multi Trends We’re Ready to Tackle 1) Deepwater & Harsh ConditionsUltra-large offshore structures and tighter weather windows demand higher factors of safety, engineered redundancy and precise load sharing. Our experience in equalised lifting, load-path modelling and real-time monitoring helps expand operational windows without compromising safety. 2) FPSO/FLNG ModularisationShifts in global gas supply are […]

    Read more
  • Juli Lifting Megawatt-scale Commercial Floating Wind Power System

    Juli Lifting Equipment Assists in the World’s First Megawatt-Class Commercial Aerostats Wind Power System Completing Test Flight in Gobi Desert Conditions

    From September 19 to 21, 2025, the world’s first megawatt-class high-altitude wind power generation system—the S1500-type tethered aerial wind energy system (SAWES)—successfully completed its inaugural test flight at the Naomao Lake base in Hami, Xinjiang. The tether cables and deployment/retrieval systems provided by Julei Rigging delivered critical support for the flight’s success.The successfully tested S1500 […]

    Read more
123...5NextPage 1 / 5

Leave Your Message

×

Leave Your Message