Engineering for the Extreme: Juli Sling Delivers 5,000-Ton Lifting Solutions for Dubai’s Landmark Crane Vessel
May 14, 2026
When a 5,000-ton fixed-boom crane vessel is built to conquer the Persian Gulf, lifting power is just the beginning. Reliability in extreme environments is what defines project success.
Recently, the Dubai 5,000-ton crane vessel—built by ZPMC for Drydocks World Dubai—successfully completed its load tests in Qidong, China. As a core technical partner, Juli Sling Co., Ltd. engineered and delivered the critical boom support cable system and a customized 5,000-ton lifting beam.

Engineered for the Harshest Offshore Conditions
Operating in the Middle East requires more than standard equipment. This vessel is designed to withstand:
- Extreme Heat: Specialized material selection to maintain structural integrity in high-temperature zones.
- High Salinity: Advanced anti-corrosion treatments certified by DNV for long-term marine durability.
- Complex Loads: Precision-engineered components for offshore module installation and wind farm construction.

A New Benchmark for the Persian Gulf
Following the success of international projects like the SAL 800-ton lifting beam in Germany, Juli Sling continues to set benchmarks in the high-end offshore sector. Our 5,000-ton lifting beam was manufactured under rigorous quality control, ensuring it meets the safety demands of offshore contractors and shipyards worldwide.

From bridge lifting to large vessel assembly, Juli Sling provides more than just products—we provide the “engineering confidence” required for the world’s most critical marine projects.
.png)


.png)


